Vehicle & Situation Guides

Trailer, Caravan and Plant Transport in Cornwall

Booked, planned transport for trailers, plant and small machinery — separate from an emergency breakdown recovery.

Trailer, Caravan and Plant Transport — Broadside Recovery flatbed working in Cornwall

Not every job involving a trailer or a piece of machinery is an emergency. Moving a trailer between sites, transporting plant to a new job, relocating a quad or ride-on mower, or delivering a caravan that will not be towed by its owner are all planned transport jobs rather than roadside recoveries.

These jobs come with their own considerations — securing an unfamiliar load correctly, loading and unloading with the right ramps and access, and working around site or property constraints that a straightforward car recovery never has to deal with.

This guide covers what to expect from planned transport of trailers, plant and small machinery in Cornwall. If your caravan has broken down while you were towing it, see our separate guide on caravan breakdown recovery — this page focuses on scheduled transport rather than an unplanned fault.

What counts as this kind of job

This category covers a wide range of equipment that shares one thing in common: it is not a car, van or motorcycle, and it usually needs to move between two fixed points on a schedule rather than being rescued from the roadside.

  • Box trailers, plant trailers and flatbed trailers moved between sites
  • Diggers, mini excavators and other small to medium plant
  • Ride-on mowers and groundcare machinery
  • Quads and small all-terrain vehicles
  • Caravans being delivered, sold on, or relocated without being towed by the owner
  • Small boats on trailers, where within weight and size limits

Securing and ramps

Every item in this category needs securing differently. A caravan is strapped and braced much like a car but is tall and can catch crosswinds; plant machinery needs chaining down at manufacturer-approved points, not just strapped loosely; a quad or mower needs wheel chocks and low-angle ramps to load without scraping.

Getting the securing method wrong risks the load shifting in transit, which is both a safety hazard on the road and a route to damaging the item itself. Tell us exactly what is being moved, including approximate weight and dimensions, so the right straps, chains and ramp setup are brought.

  • Plant machinery is chained at manufacturer-specified lashing points where fitted
  • Caravans are strapped at the chassis and checked for stability before travel
  • Quads and mowers use low-angle ramps and wheel chocks to prevent tipping
  • Loose attachments — buckets, mower decks, trailer accessories — are secured separately
Broadside Recovery vehicle loading, illustrating trailer, caravan and plant transport in Cornwall

Access constraints

Plant and machinery are often at building sites, farms or fields rather than a normal road, and access can be the deciding factor in how a job is planned. A digger sat on soft ground at the back of a site is a different job to one parked on a hardstanding yard.

Describe access honestly when you book — gate widths, ground conditions, whether the item can be driven to a collection point, and any site-specific rules such as banksman requirements or working hours.

  • Gate and access road widths, particularly on farms and building sites
  • Ground conditions — hardstanding, grass, mud or gravel
  • Whether the item can be moved under its own power to a loading point
  • Site rules such as permitted access times or a required banksman

Booked transport vs emergency uplift

Most trailer and plant transport is booked in advance because the item is not stranded — it simply needs to move from A to B on a schedule that suits the site, the buyer, or the job it is going to. This is generally more cost-effective and easier to plan than an emergency call-out, since the truck and route can be arranged properly rather than dispatched immediately.

That said, if plant or a trailer has broken down, become stuck, or needs urgent removal from a site, treat it as you would any other breakdown and call for an immediate response rather than waiting to book ahead.

Caravans specifically

A caravan being sold, delivered new, or relocated between storage sites without an owner towing it themselves is a common booked transport job. This is different from a caravan breakdown, where the caravan develops a fault while being actively towed — see our dedicated guide on caravan breakdown recovery for that scenario.

For booked caravan transport, give the make, model, length and approximate weight, plus collection and delivery addresses, so the job can be planned properly around access at both ends.

Booking a job

The more detail provided up front, the smoother a planned transport job runs. This is not urgent, roadside information — it is the detail that lets us plan the route, the truck and the timing properly.

  • What is being moved, with make, model and approximate weight
  • Collection and delivery addresses, including access details
  • Preferred date and any flexibility around timing
  • Any site rules, restrictions or required contacts at either end

Need this sorted today?

Need a trailer, plant or machine moved on a schedule that suits you? Book your transport slot today.

Frequently asked questions

Can you transport plant machinery between sites?

Yes, this is a common booked job. We need the type and approximate weight of the machinery plus access details at both the collection and delivery site to plan it properly.

Is transporting a caravan I'm not going to tow myself different from caravan breakdown recovery?

Yes. This is planned transport of a caravan that is not currently being towed, whereas breakdown recovery deals with a fault occurring while the caravan is being actively towed — see our caravan breakdown guide for that situation.

Can you move a quad or ride-on mower a short distance locally?

Yes, these are straightforward booked jobs using low-angle ramps and wheel chocks. Give us the approximate weight and where it needs collecting from.

What if the site has restricted access for a large trailer?

Tell us about gate widths, ground conditions and any site rules when you book, so we can plan the right vehicle and, if needed, an alternative loading point.

Do I need to book plant transport in advance?

For a planned move, yes — booking ahead usually means a more efficient, cost-effective job than an urgent same-day request. If the machinery has broken down or needs urgent removal, call us as you would for any breakdown.

Can loose attachments like a mower deck or digger bucket travel with the machine?

Often yes, provided they are secured separately and safely for transport. Mention any attachments when you book so we bring the right securing equipment.

Services covered in this guide

Related guides

All 53 recovery guides

Need Recovery Now?

Call Broadside Recovery Ltd for fast, reliable 24/7 breakdown recovery and vehicle transport across Cornwall.